A method is proposed for calculating the processing time of initial task in multi-channel queueing system with consideration of the task separation into independent subtasks that are treated parallelly with further assembling of the results. The process duration is represented as the distribution of the maximum from the random durations of the subtasks processing. The starting moments of the desired distribution are found by numerical integration along the semi-axis with the Chebyshev-Laguerre weight. Results of numerical calculations are compared with data obtained by simulations.