For example,Бобцов

MATHEMATICAL MODEL OF THE WORKPLACE OF MEASURING INSTRUMENTS VERIFICATION AS A NON-STATIONARY SERVICE SYSTEM

Annotation

A model of the workplace for measuring instruments verification as a non-stationary service system with relative priorities of the incoming flow of applications is presented. The model is based on a multidimensional graph construction and corresponding system of Chapman—Kolmogorov equations. The model makes it possible to identify and explain the main patterns and technological parameters of workplace functioning at a qualitative level. The presented model can be used to calculate the throughput of incoming measuring instruments operating under conditions of varying workload over a certain time interval. It is also possible to use the model to substantiate technical requirements when designing workplaces that are supposed to be used in conditions of changing workload.

Keywords

Articles in current issue