Journal
Scientific and technical journal «Priborostroenie»
UDK004.942
Issue:3 (58)
Download PDF616 Kbyte
The known methods of calculating pressure, density, temperature, and viscosity distributions in gas-liquid mixture along exploitation well lifting pipe are examined. A method now used in the training complex for specialists in continental shelf development is proposed for the application.